Pine Valleys Water Supply Scheme (WSS)


Announced Allocations

The Pine Valleys Water Supply Scheme is running with the following announced allocations:
 
AA High Priority A
Last updated: 1 July 2012
100%

Parameters used in Calculating Announced Allocations

Formula for High Priority A Water Allocations
  • 100% when the level in North Pine Dam is greater than EL 29.3m AHD
  • When the water level in North Pine Dam is equal to or less than EL 29.3m AHD the High Priority A Announced Allocation must be calculated using the following formula as set out in s101 of the Moreton Resource Operations Plan:
 
AAHPA = ((UV+DIVHPA)/HPAA) x 100
 
Parameters for High Priority AA calculation
 
The following parameters were used in calculating the current AA High:
 
UV (Useable Volume)  170,345 ML
DIVHPA (High Priority Diversion)  0 ML
HPAA (High Priority A Water Allocations)  59,000 ML
 
 
If you have any further questions please contact Seqwater on 1800 077 005 or email irrigatorquestions@seqwater.com.au. Our postal address is: PO Box 16146, City East Queensland 4002.
 
 
Pine Valleys Scheme Region