Nerang Water Supply Scheme (WSS)


Announced Allocations

The Nerang Water Supply Scheme is running with the following announced allocations:
 
AA High Priority
Last updated  1 July 2012
100%

Parameters used in Calculating Announced Allocations

Formula for AA High Priority
  • 100% when the level in Hinze Dam is greater than EL 73.0m AHD
  • When the water level in Hinze Dam is equal to or less than EL 73.0m AHD the AA High must be calculated using the following formula as set out in s76 of the Gold Coast Resource Operations Plan:
 
AAHP = ((UV+DIVHP)/HPA) x 100
 
Parameters for AA High Priority calculation
The following parameters were used in calculating the current AA High:
   
UV (Useable Volume)  269,181 ML
DIVHP (High Priority Diversion)  0
HPA (High Priority Water Allocations)  84,000 ML
  
Please refer to the Gold Coast Resource Operations Plan for further details regarding High Priority Announced Allocations in the Nerang Water Supply Scheme.
 
If you have any further questions please contact Seqwater on 1800 077 005 or email irrigatorquestions@seqwater.com.au. Our postal address is: PO Box 16146, City East Queensland 4002.
 
 
Nerang Scheme Region